Pleasant Valley Shopping Center Site Improvements
Altoona, PA
The project included the removal of all existing concrete between the shopping center building entrances, and replaced with accessible building entrances, ADA ramps, and parking lot pavement as required compliance.
Stahl Sheaffer assisted with site engineering and developed a 360° static 3D LiDAR scan of multiple units within the shopping center for the sidewalk and building entrances located along the front side of the shopping center, which included a frontage of approximately 1,400 LF. This survey formed the basis of design and construction documents defining all work required to correct ADA deficiencies throughout the shopping center.
![]()
|