Hog Creek Wind Farm Road Condition Report
Global Renewable Energy Company (RES), Hardin County, OH |
|
The Hog Creek Wind Project implemented a roadway maintenance strategy developed by Stahl Sheaffer Engineering that included roadway upgrades and restorations to support construction traffic for the configuration of 30 wind towers and related equipment. The strategy ensured there were no possible obstructions, constraints, or safety concerns.
To fully document and archive the roadway conditions, Stahl Sheaffer performed the following tasks:
An assessment of existing bridge/culverts along the route were performed to ensure their safety. This included:
|