Construction Management & Inspection Open-End
FDC-500-809, State-Wide
DCNR, Various Locations, PA |
![]()
|
Stahl Sheaffer holds an open-end contract to perform construction management on various bridge, site, and building projects on state forest and state park lands. Inspectors are responsible for:
|
Following are representative examples:
- Medix Run Bridge Replacement – Inspection of demolition of existing steel I-beam bridge on stone masonry abutments with a 15’-2” clear span, to be replaced with a precast reinforced concrete box culvert and precast concrete end sections with an 18 foot clear roadway width.
- Laurel Run Box Culvert – Inspection of demolition of existing steel beam bridge with nail laminated deck to be replaced with precast reinforced concrete box culvert and precast concrete end sections with 18’ clear roadway width.
- Mix Run Box Culvert – Inspection of demolition of existing structure 3’-0” x 4’-0” elliptical metal pipe to be replaced with precast reinforced concrete box culvert and precast concrete wingwalls.
- Reeds Gap State Park – Inspection of all general construction work consisting of site work, leakage testing, excavation, leakage testing, construction, demolition of existing structures, and performance testing.
Stahl Sheaffer is also performing bridge design and NBIS inspections under open-end contracts for DCNR.