Parking Lot Geotechnical Analysis & FDR Mix Designs

Cuyahoga, OH

Client

JACK Thistledown Racino

Services

  • Geotech Analysis

  • FDR Mix Designs

Stahl Sheaffer completed geotechnical analysis and recommendations for the JACK Thistledown Racino parking lot in 2016. Stahl Sheaffer performed two Full Depth Reclamation (FDR) mix designs (10” FDR and 12” FDR) based on the strata of the on-site materials as well as an overlay pavement design. Compared with the initial design, Stahl Sheaffer’s designs increased the pavement structure capacity and reduced the proposed overlay thickness from 4” to 2.5” plan.