STAHL SHEAFFER ENGINEERING
  • Home
  • About
    • In Memoriam - Aaron Fayish
  • News
    • Press
  • SERVICES
    • Bridge | Tunnel
    • Building Structures
    • Construction Inspection
    • Geotechnical Services
    • Site Engineering
    • Survey & Reality Capture
    • Transportation
  • MARKETS
    • Academic
    • Athletic & Recreation
    • Municipal Services
    • Private Development
    • Public Agencies >
      • PA Turnpike Commission (PTC)
    • Energy
  • CAREERS
  • Locations & Contact
  • OUTREACH
    • Community
    • Associations
    • Aaron C. Fayish Memorial Scholarship

Construction Management & Inspection Open-End
​FDC-500-809, State-Wide

DCNR, Various Locations, PA

DCNR CM CI Open-End FDC-500-809.pdf
File Size: 378 kb
File Type: pdf
Download File

Stahl Sheaffer holds an open-end contract to perform construction management on various bridge, site, and building projects on state forest and state park lands. Inspectors are responsible for:
Picture
  • Attending preconstruction conferences and regular job conferences with the Department and contractor for each project.
  • Keeping records.
  • Documenting construction work.
  • Providing site inspection.
  • Preparing current and final estimates for payment to the contractor.
  • Assisting the Department in obtaining compliance with labor standards, safety and accident prevention, and equal opportunity provisions of the contract.
  • Performing other duties as required.
  • Assembling all pertinent construction data into a manual for submission on all bridge construction projects.
Following are representative examples:
  • Medix Run Bridge Replacement – Inspection of demolition of existing steel I-beam bridge on stone masonry abutments with a 15’-2” clear span, to be replaced with a precast reinforced concrete box culvert and precast concrete end sections with an 18 foot clear roadway width.
  • Laurel Run Box Culvert – Inspection of demolition of existing steel beam bridge with nail laminated deck to be replaced with precast reinforced concrete box culvert and precast concrete end sections with 18’ clear roadway width.
  • Mix Run Box Culvert – Inspection of demolition of existing structure 3’-0” x 4’-0” elliptical metal pipe to be replaced with precast reinforced concrete box culvert and precast concrete wingwalls.
  • Reeds Gap State Park – Inspection of all general construction work consisting of site work, leakage testing, excavation, leakage testing, construction, demolition of existing structures, and performance testing.
Stahl Sheaffer is also performing bridge design and NBIS inspections under open-end contracts for DCNR.
Picture
Picture

Contact Us
  • Home
  • About
    • In Memoriam - Aaron Fayish
  • News
    • Press
  • SERVICES
    • Bridge | Tunnel
    • Building Structures
    • Construction Inspection
    • Geotechnical Services
    • Site Engineering
    • Survey & Reality Capture
    • Transportation
  • MARKETS
    • Academic
    • Athletic & Recreation
    • Municipal Services
    • Private Development
    • Public Agencies >
      • PA Turnpike Commission (PTC)
    • Energy
  • CAREERS
  • Locations & Contact
  • OUTREACH
    • Community
    • Associations
    • Aaron C. Fayish Memorial Scholarship